projects.

Completed site excavation, grading, and compaction to create a level, stable pad ready for construction.

Complete driveway rebuild with proper grading and compaction. A drainage swale was added along the side to manage runoff.

Restructured the driveway to improve drainage and finished with 3/4″ crushed stone.

Graded and prepared the site for upcoming construction.

Constructed a natural rock retaining wall to define and support the perimeter of the guest cottage.

Completed trench excavation to required depth and length.

Prepared and compacted a level gravel base for a future garage. Finished with a field stone retaining wall.

Installed a new paving stone patio with a raised flower bed and retaining wall. Finished the surrounding area with crushed stone.